Metals.lv Preloader

Steel Pipes & Beams

Steel Pipes & Beams

21/04/2017 01:04:25

Loaded in a truck metal for the customer. The following work was carried out: Shot blasting of metal structures Sa_2.5 and primer 60μ. The following metal positions were used: Pipe 80x80x5 S355 L = 12000, Beam HEA 160 S355 L = 12100, Pipe 120x120x5 S355 L = 12000, Beam HEA 200 S355 L = 12100, Beam HEA 220 S355 L = 12100.

@IDLGROUP
Followed by
Back To Top